“BN” Temporary Closure 2026

The BN will closed between M26 and M38 from November 2nd through November 4 and will be open on November 5th for Firesteel Bridge safety inspections. There will be no Detour available. Please abide and respect this closure and it’s signage.

Scroll to Top