The BN will closed between M26 and M38 from November 2nd through November 4 and will be open on November 5th for Firesteel Bridge safety inspections. There will be no Detour available. Please abide and respect this closure and it’s signage.
The BN will closed between M26 and M38 from November 2nd through November 4 and will be open on November 5th for Firesteel Bridge safety inspections. There will be no Detour available. Please abide and respect this closure and it’s signage.